Game systems
Packages go out. Residual value stays in-house.
After the dealer, Kevin installs his purchased death machines on the shared operator stage. The subsequent night shift moves operations into a dedicated logistics layout with alternative paths and industrial choke points.
Operation
Automatic machines work independently; manual installations are triggered through CCTV and VCR direction. A coordinated mixture of damage, placement and intervention is more dependable than a cheap passive portfolio.
Qualification
The production shift is a compulsory part of the distribution-centre route. Its report evaluates achieved performance rather than mere machine ownership.
Stats
- Routes
- 12
- Rooms
- 6
- Group size
- 2–5
- Victims per shift
- 30
- Victim health
- 195
- Victim speed
- 4.6
- Bonus target
- 85%
These values come directly from the game project data. Generator: pae.project_catalog, version PAE 0.219.0, as of 2026-08-20
